This project consisted of one residential property, containing a total of two passenger lifts. Works were only completed on one of the lifts.
The property is located in Finchley Road, London.
The Lift Consultancy were originally appointed by the client to complete a survey and report, which provided details on the condition of the existing equipment and recommendations, budgets and timescales for works required.
A meeting was held with the client and their client to discuss the options and on the back of this, the decision was made to proceed with a technical specification and tender process. A full tender review was conducted, along with a full report and recommendations.
Post tender interviews were completed with two contractors and we assisted the client in the appointment of the successful contractor.
Following the appointment of the contractor, we assisted the client with contract preparation and a pre-construction information pack as part of our contract administration and CDM Principal Designers role.
A programme of works was agreed and we held a pre-start meeting with the client and the tenants Liason to discuss site specifics and logistics.
A mid-term progress review was completed to check progress against programme and minutes were issued recording the key discussion points.
A Final Acceptance check was completed at the end of the project, confirming works were installed to the specification A defects list and practical completion certificate was produced and a final visit was completed to sign-off the defects.
Throughout the project, we were also responsible for certifying payment applications.
Due to the property being residential, we assisted the client to ensure the contractor restricted noisy works between the hours of 10am and 4pm.